Township 31 MD, Maine

Information from Humphrey, 2003

    The Township 31 MD project was was on Route 9 between Bangor and Calais, and was similar to the North Yarmouth project.  Table 1 lists the thickness of each layer of material in the test and control sections.  Figure 1 gives a cross section of the project, and figure 2 shows the layout of each section described in table 1.

Table 1. Summary of TWP31-MD Test Section Configuration

Section

Tire shred type

Thickness of layer (in.)

Tire shreds

Borrow Cover

Subbase course

Pavement (travel lanes)

Control

----

----

----

25

9

1

A

24

24

25

9

2

A

24

48

25

9

3

A

24

72

25

9

4

B

24

48

25

9

Figure 1. TWP31-MD field trial - cross section (Nickels, 1995)

cross section

Figure 2. Twp31-MD field trial - longitudinal section (Nickels, 1995)

longitudinal section

    Compaction was completed most effectively with a vibratory tamping foot and a vibratory smooth drum roller.  These two compaction methods worked equally well, but compaction with a bulldozer wasn't as effective.

Pavement Deflections

 

Our source links are not currently working.  We apologize for any inconvenience. 

Questions or comments about beneficial use?  Please direct them to a staff member.

 